Two-Course Work
| View Cart ⇗ | Info
“For two-course floors and pavements, a concrete base of about four inches thick, mixed 1:3:5 (that is, one sack of cement, 3 cubic feet of sand, and 5 cubic feet of gravel), is first placed in the forms."—The Federal Digest, 1921
Galleries
Construction IndustrySource
The Federal Digest Farm Economy (Minneapolis, MN: Better Farming Association, 1921)
Downloads
2400×1437, 921.5 KiB
1024×613, 166.0 KiB
640×383, 81.8 KiB
320×191, 23.8 KiB