Two-Course Work

| View Cart ⇗ | Info

“For two-course floors and pavements, a concrete base of about four inches thick, mixed 1:3:5 (that is, one sack of cement, 3 cubic feet of sand, and 5 cubic feet of gravel), is first placed in the forms."—The Federal Digest, 1921

Source

The Federal Digest Farm Economy (Minneapolis, MN: Better Farming Association, 1921)

Downloads

TIFF (full resolution)

2400×1437, 921.5 KiB

Large GIF

1024×613, 166.0 KiB

Medium GIF

640×383, 81.8 KiB

Small GIF

320×191, 23.8 KiB